Temporary Road Closure: - R586-25 and R586-12(Part) – for works at Laragh Bandon
Foilsithe
Oscailte le haghaidh aighneachtaí ó
Dúnadh na haighneachtaí
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
Foilsithe
Oscailte le haghaidh aighneachtaí ó
Dúnadh na haighneachtaí
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
Tá comhairliúchán dúnta
Temporary Road Closure: - R586-25 and R586-12(Part) – for works at Laragh Bandon. Closure from the L-2019-0 Junction at Carhoon East to Allen Square Junction, Bandon. (The works area is located from a point 55 metres east of Laragh Industrial Estate Junction to a point 300 metres further east.) to facilitate Cattle Underpass Construction.
R586-25 and R586-12(Part) – for works at Laragh Bandon. Closure from the L-2019-0 Junction at Carhoon East to Allen Square Junction, Bandon. (The works area is located from a point 55 metres east of Laragh Industrial Estate Junction to a point 300 metres further east.) from 21/02/2022 to 24/36/2022 – Objections to this proposed temporary road closure should be made in writing, to the undersigned, quoting Ref: TRC-142-2021, not later than 5pm on Wednesday 19 January 2022.
Director of Services, Roads and Transportation, Cork County Council, The Courthouse, Skibbereen, Co Cork
Chun an comhairliúchán a fheiceáil cliceáil ar an gcnaipe thíos.