May 2007 Independent Verification Report on Proposed Terminal Two for Dublin Airport

Cuardaigh ar fad gov.ie

Foilsiú

May 2007 Independent Verification Report on Proposed Terminal Two for Dublin Airport

  • Ó: An Roinn Iompair

  • Foilsithe: 29 Samhain 2006
  • An t-eolas is déanaí: 24 Iúil 2019

The action plan provides for the building of a Dublin Airport Authority owned new Terminal (Terminal Two) at Dublin Airport to be open in 2009.

May 2007 Independent Verification Report on Proposed Terminal Two for Dublin Airport
The verification team was appointed by the Department of Transport in March 2006 to verify the specification and cost of Terminal Two.
Amharc amharc

Is ann don fhoirm seo d’aiseolas, agus sin amháin, a bhaineann leis an leathanach reatha.

Ná cuir faisnéis phearsanta ná airgeadais san áireamh.

Chun gov.ie a fheabhsú, déanfar anailís ar an bhfaisnéis a chuireann tú isteach agus ní thabharfar freagra uirthi ar bhonn indibhidiúil.

Conas mar a bhí d’eispéireas ar an leathanach reatha? (ag teastáil)

Tá 400 carachtar fágtha agat