Circular L3/13 - Design/Build/Operate (DBO) Group Water Scheme Contracts - Grants towards Capital Replacement Costs

Cuardaigh ar fad gov.ie

Ciorcláin L3/13

Circular L3/13 - Design/Build/Operate (DBO) Group Water Scheme Contracts - Grants towards Capital Replacement Costs

Circular L3/13 - Design/Build/Operate (DBO) Group Water Scheme Contracts - Grants towards Capital Replacement Costs
The Explanatory Memorandum included with this circular sets out the terms and conditions applying to the grants which may be paid by local authorities towards the Capital Replacement Costs of Design/Build/Operate (DBO) Group Water Schemes supplying water for domestic use.
Amharc amharc

Is ann don fhoirm seo d’aiseolas, agus sin amháin, a bhaineann leis an leathanach reatha.

Ná cuir faisnéis phearsanta ná airgeadais san áireamh.

Chun gov.ie a fheabhsú, déanfar anailís ar an bhfaisnéis a chuireann tú isteach agus ní thabharfar freagra uirthi ar bhonn indibhidiúil.

Conas mar a bhí d’eispéireas ar an leathanach reatha? (ag teastáil)

Tá 400 carachtar fágtha agat