Part 8 - Proposed Development of Indoor Basketball Court & Clubhouse at Carhookeal, Mallow, Co. Cork

Cuardaigh ar fad gov.ie

Comhairliúchán

Part 8 - Proposed Development of Indoor Basketball Court & Clubhouse at Carhookeal, Mallow, Co. Cork

  • Ó: Comhairle Chontae Chorcaí

  • Foilsithe: 23 Bealtaine 2024
  • oscailte le haghaidh aighneachtaí ó: 23 Bealtaine 2024
  • dúnadh na haighneachtaí: 5 Iúil 2024
  • An t-eolas is déanaí: 12 Aibreán 2025

Tá an Comhairliúchán dúnta

The proposed development consists of an indoor basketball court and clubhouse and will include the following:

  • a full-size indoor basketball court
  • changing facilities including 2 number dressing rooms
  • toilet & shower facilities
  • an activity hall
  • reception/lobby area
  • machinery/sports equipment storage
  • access road to clubhouse through site
  • associated groundworks including drainage, watermain connections and electrical ducting

Comhairliúchán seachtrach

Chun féachaint ar an gcomhairliúchán cliceáil ar an gcnaipe thíos.

Is ann don fhoirm seo d’aiseolas, agus sin amháin, a bhaineann leis an leathanach reatha.

Ná cuir faisnéis phearsanta ná airgeadais san áireamh.

Chun gov.ie a fheabhsú, déanfar anailís ar an bhfaisnéis a chuireann tú isteach agus ní thabharfar freagra uirthi ar bhonn indibhidiúil.

Conas mar a bhí d’eispéireas ar an leathanach reatha? (ag teastáil)

Tá 400 carachtar fágtha agat