Collon Bridge Replacement

Cuardaigh ar fad gov.ie

Comhairliúchán

Collon Bridge Replacement

  • Ó: Comhairle Chontae Dhún na nGall

  • Foilsithe: 16 Eanáir 2020
  • oscailte le haghaidh aighneachtaí ó: 14 Eanáir 2020
  • dúnadh na haighneachtaí: 27 Márta 2020
  • An t-eolas is déanaí: 11 Aibreán 2025

Tá an Comhairliúchán dúnta

Summary

Donegal County Council propose to replace Collon bridge with a 1200mm diameter pipe in the townland of Glebe, Carndonagh, part of the Inishowen Municipal District as scheduled below.

The project will include:

• Removal of the existing structure and replacement with a single pipe.

• Regrading of the stream to the downstream side of the bridge.

The bridge is located 2.5 km to the west of Carndonagh town on the R238.

Any existing services will be accommodated during the bridge replacement works.

Submissions and observations with respect to the proposed development may be made in writing to The County Secretariat, Donegal County Council, County House, Lifford, County Donegal, F93 Y622 before 5.00pm on Thursday 27th March 2020.

Comhairliúchán seachtrach

Chun féachaint ar an gcomhairliúchán cliceáil ar an gcnaipe thíos.

Is ann don fhoirm seo d’aiseolas, agus sin amháin, a bhaineann leis an leathanach reatha.

Ná cuir faisnéis phearsanta ná airgeadais san áireamh.

Chun gov.ie a fheabhsú, déanfar anailís ar an bhfaisnéis a chuireann tú isteach agus ní thabharfar freagra uirthi ar bhonn indibhidiúil.

Conas mar a bhí d’eispéireas ar an leathanach reatha? (ag teastáil)

Tá 400 carachtar fágtha agat