Construction of footpath and public lighting along the L-1601 at Rooskey, Co. Leitrim
- Foilsithe: 23 Meitheamh 2022
- oscailte le haghaidh aighneachtaí ó: 29 Meitheamh 2022
- dúnadh na haighneachtaí: 27 Iúil 2022
- An t-eolas is déanaí: 23 Meitheamh 2022
Tá an Comhairliúchán dúnta
Construction of a public footpath of 2.0m wide and associated public lighting along the L-1601 outbound from Roosky Village, from the end of the existing footpath as far as the 80km/hr speed limit north of the village, extending for a distance of approximately 340m.
Comhairliúchán seachtrach
Chun féachaint ar an gcomhairliúchán cliceáil ar an gcnaipe thíos.