Proposed Development on R446 Old Dublin Road Athlone
- Foilsithe: 21 Iúil 2025
- oscailte le haghaidh aighneachtaí ó: 21 Iúil 2025
- dúnadh na haighneachtaí: 1 Meán Fómhair 2025
- An t-eolas is déanaí: 21 Iúil 2025
Tá an Comhairliúchán ar oscailt
Location of proposed development:
R446 Old Dublin Road, from the Ankers Bower Roundabout (R446 / MacDiarmada Road junction) and terminating just west of the Creggan Roundabout (R446 / N62 junction), approximately 2.7km long.
Nature and extent of proposed development:
- the provision of a 2.3m wide two-way segregated cycle track one side of the carriageway, or 2.0m wide one-way segregated cycle track on both sides of the carriageway, reducing in places where constraints exist
- the provision of 2.0m wide footpaths on both sides of the carriageway, reducing in places where constraints exist
- reduction in road carriageway widths (typically 3m wide lanes)
- junction realignments and the introduction of raised crossings on side roads to prioritise pedestrian movements
- straight through cycle lane/track crossings on side road junctions to prioritise cyclists movements
- the provision of signalised crossings for pedestrians and cyclists
- upgrading of the Ankers Bower Roundabout, Willow Park Roundabout, and Wash House Turn Roundabout to a compact roundabouts with provisions for pedestrians and cyclists
- proposed signalised junctions at the existing IDA Business Park Junction and Athlone Business Park Junction
- the provision of landscaping
Comhairliúchán seachtrach
Chun féachaint ar an gcomhairliúchán cliceáil ar an gcnaipe thíos.