44 of 2025 |
Atlantic Marine Energy Test Site Deployment of a Floating Lidar System |
43 of 2025 |
Important Procedures in the Event of Control System Failure in Fishing Vessels |
42 of 2025 |
Mares Connect Cable Route Geophysical Survey, Environmental Sampling Geotechnical Sampling Opera |
41 of 2025 |
Celtic Sea Geophysical and Benthic Surveys and Deployment of Metocean Buoys |
40 of 2025 |
Irish Air Corps Air to Ground Live Firing Exercise D1 Gormanston Ranges |
39 of 2025 |
Celtic Interconnector Project - Irish Sea Installation and Operations |
38 of 2025 |
Prohibition on the Use of Certain AFFF (Foam) Fire Extinguishers |
37 of 2025 |
Sligo and Donegal Bay Hydrodynamic and Environmental Modelling |
36 of 2025 |
The Maritime Navigations Safety & Emergency Response Guidance Documents for Offshore Renewable Energy Installations (OREI) |
35 of 2025 |
Corrib Gas Field Offshore Electrical Fault Finding |
34 of 2025 |
OSPAR Proposals to Manage Discharge from Exhaust Gas Cleaning Systems (EGCS) |
33 of 2025 |
Skerries Pier, Co. Dublin Pier Partly Closed |
32 of 2025 |
Buncrana Harbour, Co. Donegal Plough Dredging |
31 of 2025 |
Mares Connect Cable Route Geotechnical Surveys |
30 of 2025 |
Compliance with EU Accessibility Directive Regulations – National Transport Authority |
29 of 2025 |
Castlefreke, Co. Cork Geophysical and Geotechnical Survey Ameded 21/05/2025 |
28 of 2025 |
Nearshore Works Claycastle Beach, Youghal, Co. Cork |
27 of 2025 |
Fishing Vessels Equipped with Refrigerated Sea Water Systems |
26 of 2025 |
Celtic Interconnector Project KP 2.5 and KP 10 Surveys Amended 6/06/2025 |
25 of 2025 |
Notice to owners of fishing vessels operating under the Code of Practice: Design, Construction, Equipment and Operation of Small Fishing Vessels of less than 15 |
24 of 2025 |
Enhanced Safety Training for Skippers and Crews of Fishing Vessels Less than 15m Length overall |
23 of 2025 |
North Celtic Sea Offshore Wind Farm Recovery of Metocean Equipment |
22 of 2025 |
Code of Practice for the Safe Operation of recreational craft |
21 of 2025 |
Celtic Interconnector Project Trenching and Boulder Clearance Amended (13/06/2025) |
20 of 2025 |
The Safe Operation of Recreational Craft - Think and Prepare – Fatigue |
19 of 2025 |
Kilmore Quay, Celtic Sea Telecommunication Cable Decommissioning Works |
16 of 2025 |
The Safe Operation of Recreational Craft Think and Prepare – Wear a Personal Flotation Device/Lifejacket |
15 of 2025 |
Notice of Irish Anglerfish and Megrim Survey (IAMS) 2025 – Leg III, North and Northwest Coasts. |
14 of 2025 |
Publication of Revised Directions as to the Examination of Deck Officers and Ratings in the Mercantile Marine and of Deck Officers for Fishing Vessels |
13 of 2025 |
Update Requirement for Ship Radio Licence Holders |
12 of 2025 |
Consultation on Ratification and Implementation of the Work in Fishing Convention, 2007 (Amended) |
11 of 2025 |
The Safe Operation of Recreational Craft Think and Prepare – Tell someone about your plans and let the Coast Guard know |
10 of 2025 |
INFOMAR Surveys 2025 - Celtic Sea, Atlantic Ocean and Irish Sea |
9 of 2025 |
The Safe Operation of Recreational Craft Think and Prepare – Identify and Assess Hazards and Risks |
8 of 2025 |
Southern Coast of Ireland Beam Trawl Survey |
7 of 2025 |
Voluntary replacement of rocket parachute flares Kokusai Kakoh Co. Ltd. Type: KP-16 |
6 of 2025 |
Amendments to the Form of Ballast Water Record Books |
5 of 2025 |
Hydrographic and Geophysical Surveys Celtic Sea, Atlantic Ocean and Irish Sea |
3 of 2025 |
Stability requirements for ro-ro passenger ships (Directive 2003/25/EC) – Sea Areas crossed by ro-ro passenger ships operating on regular service |
2 of 2025 |
Irish Anglerfish and Megrim Survey (IAMS) 2025 West, Southwest and South Coasts Legs I and II |
1 of 2025 |
Corrib Gas Field Offshore Subsea Maintenance Works (Amended 29/01/2025) |