Collection
Review of the South Galway Flood Study Report
Published on
Last updated on
Published on
Last updated on
Review of the South Galway Flood Study Report:
Assessment of the Existing Ballinderreen / Kilternan Flood Relief Scheme
Review of the Mannin Cross, Kilchreest and Termon Flood Alleviation Schemes
Engineering Proposals for the Reinstatement of Culverts on the N18 and the Provision of New Culverts on Minor Roads at Kiltartan / Feasibility of an Overland Channel from Coole to Kinvarra: