Proposed Development on Dublin Road & Ardmore Road Mullingar

Cuardaigh ar fad gov.ie

Comhairliúchán

Proposed Development on Dublin Road & Ardmore Road Mullingar

  • Ó: Comhairle Chontae na hIarmhí

  • Foilsithe: 21 Iúil 2025
  • oscailte le haghaidh aighneachtaí ó: 21 Iúil 2025
  • dúnadh na haighneachtaí: 1 Meán Fómhair 2025
  • An t-eolas is déanaí: 21 Iúil 2025

Tá an Comhairliúchán dúnta

Location of proposed development:

Dublin Road, from the N52 Marlinstown Roundabout to the area in the vicinity of Bellview Clinic; Ardmore Road, from its roundabout junction with Dublin Road and Petitswood Close to the entrance to Ardmore Hills; and all junctions along these roadways. The scheme is approximately 2.5km in length.

Nature and extent of proposed development:

  • proposed improvements to footpaths (minimum width 1.8m);
  • provision of two-way segregated cycle tracks for approximately 1.7km (minimum width 2m);
  • provision of approximately 330m of shared pedestrian and cyclist paths;
  • bus stop infrastructure;
  • pedestrian crossings;
  • traffic calming measures;
  • upgrade of the existing National Science Park Roundabout, including pedestrian crossing facilities;
  • upgrade of all junctions including provision of pedestrian crossing facilities;
  • tie-in to existing active travel facilities on Ardmore Road;
  • tie-in to existing on-road cycle paths on the Dublin Road approaching the Delvin Road Junction;
  • vehicular carriageway width of 6.5m along Dublin Road and 6m along Ardmore Road

Comhairliúchán seachtrach

Chun féachaint ar an gcomhairliúchán cliceáil ar an gcnaipe thíos.

Is ann don fhoirm seo d’aiseolas, agus sin amháin, a bhaineann leis an leathanach reatha.

Ná cuir faisnéis phearsanta ná airgeadais san áireamh.

Chun gov.ie a fheabhsú, déanfar anailís ar an bhfaisnéis a chuireann tú isteach agus ní thabharfar freagra uirthi ar bhonn indibhidiúil.

Conas mar a bhí d’eispéireas ar an leathanach reatha? (ag teastáil)

Tá 400 carachtar fágtha agat