Part 8 R-572 Castletownbere Gateway, Pedestrian Enhancement and Traffic Management Proposal
Foilsithe
Oscailte le haghaidh aighneachtaí ó
Dúnadh na haighneachtaí
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
Foilsithe
Oscailte le haghaidh aighneachtaí ó
Dúnadh na haighneachtaí
An t-eolas is déanaí
Teanga: Níl leagan Gaeilge den mhír seo ar fáil.
Tá comhairliúchán dúnta
R-572 Castletownbere Gateway, Pedestrian Enhancement and Traffic Management Proposal which includes the construction of shared use footpaths and cycle ways, footpaths, junction improvements and traffic calming at Rodeen, Derrymihan West and Foildarrig, Castletownbere between the Bridewell junction of the R-572-312 and L-4918-0 and a point 363 metres west of the Rodeen Cross junction of the R-572-312 and L-4920-0 for a distance of 2230 metres.
Submissions and observations with respect to the proposed development may be made on or before 5:00pm on 23rd September 2019 as follows:
By e-mail to: bantryroadsoperations@corkcoco.ie
or
In writing and clearly marked: R-572 Castletownbere Gateway, Pedestrian Enhancement and Traffic Management Proposal, Director of Services c/o Bantry Area Engineer’s Office, Aras Beanntraí, Bantry, Co. Cork.
Chun an comhairliúchán a fheiceáil cliceáil ar an gcnaipe thíos.